General Director of Intergas Central Asia, JSC

Chairman of the Management Board

YerkenZ. KASSEYEV

Mr. Kasseyev was born on August 14, 1967 in East-Kazakhstan oblast.
Education: Graduate of Kazakh Polytechnical Institute (1991) named after V.I. Lenin, Engineer.

Experience:
1991 – 1998,  Management positions in commercial entities.

1998 – 2001, Director of Ust-Kamenogorsk Gas Management Administration, LLP, then Deputy Managing Director of Alautransgas, OJSC.

Read more

Chairman of the Board of Directors

Ibulla
Zh.
SERDI

Deputy General Director on Economics and Finance, KazTransGas, JSC

Dair
A.
Kusherov

Independent Director

Aitmukhammed
T.
Aldazharov

Independent Director

Marat
A.
Saidnasimov

Secretary

Bakhytkali
N.
Torgayev
10 января 2022 года - день общенационального траура в Республике Казахстан
Press-office
THE STRATEGIC GAS PIPELINE “OKAREM – BEINEU” WAS REPAIRED IN EXTREMELY LIMITED DEADLINES
24.10.2019

 This is a strategically important facility, on which stable gas supplies to settlements and production facilities of Mangistau region, including the city of Aktau, depend. Moreover, the pipeline provides gas supply to the main enterprise of the region, which is responsible for the life support of the entire region, MAEK-Kazatomprom LLP.

It should be noted that as of today in the Mangistau region there is the highest consumption of natural gas compared with the entire domestic market of the country. In the last year alone, it amounted to 2.5 billion cubic meters of gas, or 19% of the whole domestic consumption.

The gas pipeline, almost continuously, has been in operation for over 40 years. Its length across the territory of Kazakhstan is 472.8 km. The continuous exploitation of the line led to a gradual onset rate of failure risk, due to the negative effect on the strength characteristics of metal and weld joints.

Given the high importance of the strategic facility Okarem-Beineu Main Gas Line, a total overhaul was carried out and 187 defective pipe length were replaced in an extremely limited deadline, in just 19 days. Also, branch joints to Beineu, Tolep automatic gas distribution stations were made, as well as a gas pipeline section was laid under two road crossings.

19.08.2024
PRIME MINISTER GOT ACQUAINTED WITH THE PROGRESS OF THE CONSTRUCTION OF THE TALDYKORGAN-USHARAL GAS PIPELINE
Read more
13.06.2024
GAS LEAK ELIMINATION TRAINING WAS CONDUCTED IN THE TURKESTAN REGION
Read more
28.02.2023
MANAGEMENT AND STAFF MEETING TO DISCUSS THE RESULTS OF INTERGAS CENTRAL ASIA ACTIVITIES IN 2022
Read more
15.04.2022
AFTER MANY YEARS OF WAITING, 22 SETTLEMENTS OF TURKESTAN REGION RECEIVED GAS
Read more